Concrete Sidewalk

Year: 
2014
Project Description: 

This 0.10 mile long section of trail extends from the end of a 10 foot wide asphalt sidewalk along Riverside Drive near Hawthorne Avenue to Carson Street at the north end of Raymond Park. The segment is currently served by a six foot wide concrete sidewalk which would need to be widened to 10 feet to create a class I trail. Some of the sidewalk is severely cracked and it would need to be replaced. There are also short bottle neck areas at the north and south end of the segment where widening is not feasible. Improvement of this section would better connect Raymond Park to Sacagawea Park and would help to complete the Greenway north of Old Town. It has an estimated cost of $20,000 and is planned for construction in three to five years.

RCC4 Concrete Sidewalk.pdf